You need to be logged in to mark episodes as watched.
Season 1
Starting the series, Mark decides on the helicopter to build and takes a tour of their factory.
Air date
September 1st, 2002
Watched this episode?
The kit arrives!
Mark examines the kit and goes over the contents. The assembly start out with the skids and then moves to the frame and tail boom.
Air date
September 2nd, 2002
Watched this episode?
Mounting the trim fins and the tail rotor. Also a demonstration of a pre-flight.
Air date
September 3rd, 2002
Watched this episode?
Avid aviator Mark Evans turns his attention to the main rotor shaft, while his flight training covers the controls and throttle
Air date
September 4th, 2002
Watched this episode?
Mark installs the engine in his home kit helicopter; countering typical mistakes made by beginner pilots.
Air date
September 5th, 2002
Watched this episode?
Flight training lessons offer Mark Evans the chance to learn how to deal with engine failure and autorotation
Air date
September 6th, 2002
Watched this episode?
Mark Evans learns to take off from both the ground and a hover position, and the exhaust and cooling systems are installed in his helicopter
Air date
September 7th, 2002
Watched this episode?
Mark fits the muffler and installs the fuel system, pressure regulator and all the hoses into his home kit helicopter.
Air date
September 8th, 2002
Watched this episode?
Installing the instrument cluster. Also in this episode is a visit by a RAF Search And Rescue helicopter and crew. The SAR crew takes us for a tour of their Sea King...
read more »
Installing the instrument cluster. Also in this episode is a visit by a RAF Search And Rescue helicopter and crew. The SAR crew takes us for a tour of their Sea King helicopter.
« read less
Air date
September 9th, 2002
Watched this episode?
Calibrating the fuel gauge and installing the last of the gauges. The instrument cluster is then installed in the airframe. Testing the engine and matching the engine control...
read more »
Calibrating the fuel gauge and installing the last of the gauges. The instrument cluster is then installed in the airframe. Testing the engine and matching the engine control computer to the engine. The engine is wired up and the lights are installed. The bodywork is started as well.
« read less
Air date
September 10th, 2002
Watched this episode?
The seats are fitted while Mark Evans turns his attention to the body panel of the home-made helicopter
Air date
September 11th, 2002
Watched this episode?
Mark Evans fits the main rotor blades and gets to grips with taxiing during his helicopter flight training session
Air date
September 12th, 2002
Watched this episode?
Mark Evans practises the quick stop, and installs the rigging into his homemade helicopter
Air date
September 13th, 2002
Watched this episode?
The upholstery of the home kit helicopter is installed, and Mark Evans paints the bodywork as his project nears completion
Air date
September 14th, 2002
Watched this episode?
Avid aviator Mark Evans reveals the complete helicopter and takes it up into the skies for its first flight
Air date
September 15th, 2002
Watched this episode?